Crowne Plaza London Ealing, An IHG Hotel – London

Maximising available roof space, we've installed a 52.48 kWp system for Crowne Plaza London Ealing, An IHG Hotel. The system will generate over 45,000 kWh of energy annually with a return on investment of less than three years!

Given the London-based hotel’s huge energy demand, we also advised installing a voltage optimiser, which resulted in an annual energy demand reduction of circa 8%, with an incredibly low return on investment of just over eight months!

Collectively, the installed technologies will save the hotel over £75,000 in its first year, increasing exponentially once the payback period is reached in less than three years.

Luca Camilleri, Sustainability Consultant of Green Shield Group, said: “Working with the team at Westmont UK has allowed me to truly understand the value of renewables to the hotel industry. With hotels in particular, we find that space is often at a premium, so maximising the benefits of the space and then adding further technologies is allowing us to deliver substantial savings.”

installation summary

completed
system size:

52.48 kWp

annual carbon
savings:

10,730 kg

annual energy
generation:

46,030 kWh
installation gallery
other case studies
Hippo Motor Group – Blackburn

140.22 kWp System

Uniroyal Global – Earby

1 MWp System

thank you for contacting us
you're taking the first steps towards protecting your energy

one of our sustainability consultants will be in touch shortly to discuss your opportunities further.
Open chat
1
Chat to our Team on WhatsApp
Hello! 👋

You can talk to our team now on WhatsApp to get immediate answers to your queries!