Maximising available roof space, we've installed a 74.21 kWp system for Doubletree by Hilton Hotel. The system will generate over 65,000kWh of energy a year with a return on investment of less than three years!
Given the huge energy demand of the prestigious Hilton hotel, we also advised on the installation of a voltage optimiser, which resulted in an annual energy demand reduction of circa 8%, with an incredibly low return on investment of just over seven months!
Collectively the installed technologies will save the hotel over £110,000 in its first year, increasing exponentially once the payback period is reached in less than three years.
Jonathan Harrison, Managing Director of Green Shield Group, said: “Working with the team at Westmont UK clearly demonstrates the value of renewables to the hotel industry. The Doubletree by Hilton in Hyde Park demonstrates that even with limited roof space, a carefully specified selection of technologies can still reduce bills and demand by over 10% at relatively minimal costs.”
installation summary
completed system size:
74.21 kWp
annual carbon
savings:
15,330 kg
annual energy
generation:
66,180 kWh
installation gallery
other case studies
Hippo Motor Group – Blackburn
140.22 kWp System
Uniroyal Global – Earby
1 MWp System
interested in learning more about solar photovolatic for your business?