Installing our 93.48 kWp on their current head office via our Power Purchase Agreement allowed Swift Dental Group to take advantage of lower energy costs and carbon offsetting with no capital expenditure on the system.
Based in Bolton, Swift Dental Group delivers innovative technology and bespoke software supported by a nationwide network of logistics hubs. Swift Dental Group has become an ultra-reliable one-stop shop for all dental restorative work in the UK.
The system installed will generate more than 86,000 kWh of green energy annually, which Swift can take advantage of at a much lower rate than the grid provides. On top of that, they have also reduced their carbon emissions by over 25 tonnes of CO2 annually, a desire that Swift made very clear from the start was very important when deciding to transition to Solar PV generation.
installation summary
completed system size:
93.48 kWp
annual carbon
savings:
25,787 kg
annual energy
generation:
86,010 kWh
installation gallery
other case studies
Hippo Motor Group – Blackburn
140.22 kWp System
Uniroyal Global – Earby
1 MWp System
interested in learning more about solar photovolatic for your business?