We've installed a 98.01 kWp system at the Lovibond, The Tintometer Ltd location in Wiltshire. The system will generate nearly 100,000 kWh of energy annually.
The system in place will reduce their carbon footprint by over 46 tons of CO2 and reduce their grid dependency by over 30% annually. The size of the Solar PV installation provides a future-proofing solution, and a business safe-guard for Lovibond. One that for many manufacturing and energy intensive businesses will provide significant long term savings.
installation summary
completed system size:
98.01 kWp
annual carbon
savings:
46,121 kg
annual energy
generation:
98,156 kWh
installation gallery
other case studies
Hippo Motor Group – Blackburn
140.22 kWp System
Uniroyal Global – Earby
1 MWp System
interested in learning more about solar photovolatic for your business?