valley hydraulics – chatburn (asbestos roof)

Valley hydraulics were concerned with their ongoing carbon footprint as a heavy energy using manufacturer. We made a significant reduction in CO2 output with a specialised asbestos roof solar installation.

Valley Hydraulics are a UK based manufacturer of high quality hydraulic cylinders. The installation at their main manufacturing facility, was carried out by our specialised asbestos installation team, utilising an over-clad system specifically designed to minimise the installation impacts associated with asbestos roofing at their premises.

installation summary

completed
system size:

88.88 kWp

annual carbon
savings:

32,443 kg

annual energy
generation:

72,919 kWh
installation gallery
other case studies
Hippo Motor Group – Blackburn

140.22 kWp System

Uniroyal Global – Earby

1 MWp System

thank you for contacting us
you're taking the first steps towards protecting your energy

one of our sustainability consultants will be in touch shortly to discuss your opportunities further.
Open chat
1
Chat to our Team on WhatsApp
Hello! 👋

You can talk to our team now on WhatsApp to get immediate answers to your queries!