System Details

System Size:
236.57 kWp

Annual Generation:
195,540 kWh

Energy Self Consumption:
95%

Annual Carbon Reduction:
37,810 kg CO2

Take control of your energy costs and reduce your carbon emissions.

Savings Details

First Year Savings:
£65,146

Ten Year Savings:
£619,984

Estimated ROI:
3.8 Years

Grid Purchase Reduction:
28%

Installation Details

Inverter Technology:
Solar Edge

Panel Technology:
Trina Solar

Installation Time:
3.8 Years

Sandal Wakefield BMW

Wakefield

We’ve installed a 236.56 kWp system for Sandal Wakefield BMW, the system provided will generate nearly 200,000kWh of energy a year, reducing their dependency on grid supplied energy by nearly 30%.
The Solar PV system we have had fitted here at Sandal Wakefield BMW is a long-term investment that will not only help us reduce our CO2 emissions, it will also help in our pledge to become a net-zero operation as we move towards the government’s target of carbon-neutral by 2050. The team at Green Shield Group have been great in guiding us through the process and we are looking forward to generating our own clean electricity.
green shield group project logo bmw
Jason Carter - Operations Director

System Details

System Size:
236.57 kWp

Annual Generation:
195,540 kWh

Energy Self Consumption:
95%

Annual Carbon Reduction:
37,810 kg CO2

Sustainability is at the forefront of concerns for BMW as an organisation. This installation provides the showroom with a long-term and significant step on their road to carbon neutrality. The installed system impacts direct usage demands and provides a huge emissions reduction of 37,810kg annually, the equivalent of planting 1,737 trees yearly.
Commercial solar installers Sheffield

Financial Details

Ten Year Savings:
£619,984

Estimated ROI:
3.8 Years

Grid Purchase Reduction:
28%

Financial Details

Ten Year Savings:
£619,984

Estimated ROI:
3.8 Years

Grid Purchase Reduction:
28%

Installation Details

Inverter Technology:
Solar Edge

Panel Technology:
Trina Solar

Installation Time:
3 Weeks

The Solar PV system we have had fitted here at Sandal Wakefield BMW is a long-term investment that will not only help us reduce our CO2 emissions, it will also help in our pledge to become a net-zero operation as we move towards the government’s target of carbon-neutral by 2050. The team at Green Shield Group have been great in guiding us through the process and we are looking forward to generating our own clean electricity.
green shield group project logo bmw
Jason Carter - Operations Director

Install Details

Inverter Technology:
Solar Edge

Panel Technology:
Trina Solar

Installation Time:
3 Weeks

Other Projects

NHS surgery installs solar

Solar PV & Battery Storage Installation

logo

Consultation & Solar PV Installation

Solar PV Installation

NHS surgery installs solar

Solar PV & Battery Storage Installation

logo

Consultation & Solar PV Installation

Maximise the performance of your investment

Pop your details below, and one of our friendly experts will be in touch within a day. (probably sooner, but we like to manage expectations).

This field is for validation purposes and should be left unchanged.

Clean Solar PV is Efficient Solar PV

Pop your details below, and one of our friendly team will be in touch within a day to discuss your cleaning quotation. (probably sooner, but we like to manage expectations).

This field is for validation purposes and should be left unchanged.

Ready to reduce your energy costs?

Pop your details in below, and one of our sustainability consultants will be in touch!

This field is for validation purposes and should be left unchanged.

Book a discovery call

Understand what you could achieve with your own Solar PV installation. We simply need 20 minutes of your time and a few pieces of information to provide a detailed accurate desktop estimation.

Leave your details below and a member of our team will get back to you within 24 hours.

This field is for validation purposes and should be left unchanged.