System Details

System Size:
172.69 kWp

Annual Generation:
144,700 kWh

Energy Self Consumption:
66.3%

Annual Carbon Reduction:
31,834 kg CO2

Take control of your energy costs and reduce your carbon emissions.

Savings Details

First Year Savings:
£50,645

Ten Year Savings:
£511,545

Estimated ROI:
3.6 Years

Grid Purchase Reduction:
35.6%

Installation Details

Inverter Technology:
Solar Edge

Panel Technology:
JA Solar

Installation Time:
3.6 Years

Soper of Lincoln BMW & Mini

Lincoln

Split across 3 buildings, we installed a total of 172.69 kWp for Soper BMW in Lincoln. The installation in place generates an estimated 144,700 kWh of energy for direct usage on-site.
Sustainability is hugely important to us here at Soper BMW, and it's been great to work with Green Shield Group to help achieve our green objectives and become the most sustainable retailer in Lincolnshire. We are looking forward to continuing our working relationship with the team and can't thank them enough for their support.
green shield group project logo bmw
Andrew Tullie, Owner of Soper BMW

System Details

System Size:
172.69 kWp

Annual Generation:
144,700 kWh

Energy Self Consumption:
66.3%

Annual Carbon Reduction:
31,834 kg CO2

Sustainability is at the forefront of concerns for BMW as an organisation. We’re helping them along this net-zero journey with our installation at the Lincolnshire branch, currently leading the way as the most sustainable retailer in Lincolnshire. This installation provided was in addition to an already vast array on their main showroom.

The installed system impacts direct usage demands and provides a huge emissions reduction of 31,834 kg annually, the equivalent of planting 1,548 trees yearly.
Green Shield Group Soper of Lincoln BMW Installation LR 1

Financial Details

Ten Year Savings:
£511,545

Estimated ROI:
3.6 Years

Grid Purchase Reduction:
35.6%

Financial Details

Ten Year Savings:
£511,545

Estimated ROI:
3.6 Years

Grid Purchase Reduction:
35.6%

Installation Details

Inverter Technology:
Solar Edge

Panel Technology:
JA Solar

Installation Time:
3 Weeks

Sustainability is hugely important to us here at Soper BMW, and it's been great to work with Green Shield Group to help achieve our green objectives and become the most sustainable retailer in Lincolnshire. We are looking forward to continuing our working relationship with the team and can't thank them enough for their support.
green shield group project logo bmw
Andrew Tullie, Owner of Soper BMW

Install Details

Inverter Technology:
Solar Edge

Panel Technology:
JA Solar

Installation Time:
3 Weeks

Other Projects

NHS surgery installs solar

Solar PV & Battery Storage Installation

logo

Consultation & Solar PV Installation

Solar PV Installation

NHS surgery installs solar

Solar PV & Battery Storage Installation

logo

Consultation & Solar PV Installation

Maximise the performance of your investment

Pop your details below, and one of our friendly experts will be in touch within a day. (probably sooner, but we like to manage expectations).

This field is for validation purposes and should be left unchanged.

Clean Solar PV is Efficient Solar PV

Pop your details below, and one of our friendly team will be in touch within a day to discuss your cleaning quotation. (probably sooner, but we like to manage expectations).

This field is for validation purposes and should be left unchanged.

Ready to reduce your energy costs?

Pop your details in below, and one of our sustainability consultants will be in touch!

This field is for validation purposes and should be left unchanged.

Book a discovery call

Understand what you could achieve with your own Solar PV installation. We simply need 20 minutes of your time and a few pieces of information to provide a detailed accurate desktop estimation.

Leave your details below and a member of our team will get back to you within 24 hours.

This field is for validation purposes and should be left unchanged.