System Details

System Size:
123.82 kWp

Annual Generation:
114,703 kWh

Energy Self Consumption:
97.2%

Annual Carbon Reduction:
34,397 kg CO2

Take control of your energy costs and reduce your carbon emissions.

Savings Details

First Year Savings:
£24941

Ten Year Savings:
£328,229

Estimated ROI:
3.6 Years

Grid Purchase Reduction:
12.8%

Installation Details

Inverter Technology:
Solar Edge

Panel Technology:
Trina Solar

Installation Time:
3.6 Years

BEP Surface Technologies

Manchester

We’ve installed a 123.82 kWp system at the Head Office location for BEP Surface Technologies. The system will generate over 114,000 kWh of energy annually with an almost 100% self-consumption rate.
Working with Green Shield Group on this project has really simplified our Solar PV installation. Chris and his team were on hand to ensure we were reaching our carbon reduction goals whilst outlining all the options we had available. We’ve looked at Solar PV as a first stage solution for our longer term carbon reduction targets and we’re really pleased with the completed installation.
green shield group project logo bep surface technologies
Andrew McClusky - Managing Director

System Details

System Size:
123.82 kWp

Annual Generation:
114,703 kWh

Energy Self Consumption:
97.2%

Annual Carbon Reduction:
34,397 kg CO2

The system in place will reduce their carbon footprint by over 34 tons of CO2 and reduce their grid dependency by over 10% annually. The investment chosen by BEP Surface Technologies represents a forward thinking and business safe-guarding opportunity that a Solar PV installation provides for many manufacturing and energy intensive businesses.

Having taken these steps BEP Surface Technologies can now rest assured that a large step has been taken on their ESG targets, and benefit from significant financial savings for years to come!
Green Shield Group BEP Surface Technologies Installation Drone LR6

Financial Details

Ten Year Savings:
£328,229

Estimated ROI:
3.6 Years

Grid Purchase Reduction:
12.8%

Financial Details

Ten Year Savings:
£328,229

Estimated ROI:
3.6 Years

Grid Purchase Reduction:
12.8%

Installation Details

Inverter Technology:
Solar Edge

Panel Technology:
Trina Solar

Installation Time:
2 Weeks

Working with Green Shield Group on this project has really simplified our Solar PV installation. Chris and his team were on hand to ensure we were reaching our carbon reduction goals whilst outlining all the options we had available. We’ve looked at Solar PV as a first stage solution for our longer term carbon reduction targets and we’re really pleased with the completed installation.
green shield group project logo bep surface technologies
Andrew McClusky - Managing Director

Install Details

Inverter Technology:
Solar Edge

Panel Technology:
Trina Solar

Installation Time:
2 Weeks

Other Projects

NHS surgery installs solar

Solar PV & Battery Storage Installation

logo

Consultation & Solar PV Installation

Solar PV Installation

NHS surgery installs solar

Solar PV & Battery Storage Installation

logo

Consultation & Solar PV Installation

Maximise the performance of your investment

Pop your details below, and one of our friendly experts will be in touch within a day. (probably sooner, but we like to manage expectations).

This field is for validation purposes and should be left unchanged.

Clean Solar PV is Efficient Solar PV

Pop your details below, and one of our friendly team will be in touch within a day to discuss your cleaning quotation. (probably sooner, but we like to manage expectations).

This field is for validation purposes and should be left unchanged.

Ready to reduce your energy costs?

Pop your details in below, and one of our sustainability consultants will be in touch!

This field is for validation purposes and should be left unchanged.

Book a discovery call

Understand what you could achieve with your own Solar PV installation. We simply need 20 minutes of your time and a few pieces of information to provide a detailed accurate desktop estimation.

Leave your details below and a member of our team will get back to you within 24 hours.

This field is for validation purposes and should be left unchanged.